In-house / fabrication personnel will be used by the project manager
to provide direct quality control of fabrication activities. These
activities at a minimum include material verification, fit-up weld
inspection, NDE verification, hydro test witness, dimensional accurancy
verification for process internals and pressure vessel, and assembly
inspection. The project manager will also use inspection / fabrication
personnel to assist with fabrication schedule expediting, equipment
assembly supervision, or other duties involving fabrication sub-contractors.
For each project, Fasam's design plan describes how the product
design engineering will be accomplished and verified prior to purchasing
and fabrication. Our detailed Inspection and Test Plan is incorporated
into the overall project Quality Plan which is compromised, at a
minimum, of the following:
 |
Project Organization Chart |
 |
Testing, Inspection, and Examination Activities |
 |
Quality Objectives |
 |
Project Schedule |
 |
Procedures. Methods, and Work Instructions |
 |
Fabrication and supply pf equipment |
| |
|
 |
Health and safety |